Summary

DateJuly 2015
Duration15 days
TypeResidential
DescriptionWater damage occurred in the kitchen and living room areas.

At Wood Floor Drying, we not only look at how to dry, but also look at the timber species to determine how much energy is required to draw the moisture out of the wood.

Here, blackbutt timber sat on concrete with a 3cm batten running across the floor. The batten wicked the moisture on the concrete and caused severe cupping.

It took Wood Floor Drying 15 days to bring the cupping back down with no sanding required.